Route 30 Feedback
The road crews are doing a great job overall, given the weather we’ve been having, but now that the Route 30 reclamation project is about to the halfway point or so, I have some feedback from the point of view of a road user.
1. Stickney Brook was the wrong “break point”
They’ve paved a base coat all the way to the Stickney Brook bridge. It would have been better for RT 30 users to have Rt 30 paved with a base coat to the Dummerston covered bridge, another mile down the road.