I-91 Brattleboro Bridge Replacement Project Update: Week of November 22

To reduce congestion on I-91, both Exit 3 on ramps will be closed on Sunday, November 29 (Thanksgiving weekend) from 11:00 am to 6:00 pm. I-91 will remain open.

I-91

To reduce congestion on I-91, both Exit 3 on ramps will be closed on Sunday, November 29 (Thanksgiving weekend) from 11:00 am to 6:00 pm. I-91 will remain open.

Northbound I-91 traffic has been relocated onto the southbound bridge. Traffic will remain reduced to one lane in each direction on I-91 until completion of the new bridge. The new bridge will be 104’ wide and is designed to carry all four lanes of traffic –two northbound and two southbound.

Route 30

Night work adjacent to Route 30 will continue this week, but will not affect traffic.

The speed limit on Route 30 near the work zone has been reduced to 40 mph. Project-related truck activity on Route 30 will continue. Route 30 will be reduced to a single lane intermittently both day and night, with flaggers regulating traffic within the work zone.

Upper Dummerston Road

The project will not have any direct affects on Upper Dummerston Road, however, local traffic on Upper Dummerston Road is likely to increase when the section of Route 30 under I-91 is closed.

West River Trail

The West River Trail is open. There are intersections between construction access and the trail path, and users should exercise extreme caution at these intersections. As an additional safety precaution, users of the West River Trail are reminded to keep pets on a leash in this area.

West River

The northbound bridge over the West River has been removed. No project-related impacts to recreational boaters are anticipated.

Text Alert System

A text alert system for the Brattleboro Bridge Replacement Project makes it possible to receive text notifications of:

• Interstate ramp closings,

• Closings of I-91,

• Closings of VT Route 30 (but not single lane closings of RT 30), and

• Any other situations regarding time sensitive project-related traffic issues.

People can sign up for this service by texting 313131 with the keyword “I91Brat”, or by using the signup widget on the project website www.i91brattleborobridge.com.

Project Progress

· The Form Traveler Equipment has been erected at Pier 1.

· Casting of the segments is underway and will continue through the winter.

· Construction of the Pier Table at Pier 2 will be completed this winter.

· Construction of the North Abutment is underway and will continue through the winter season.

· Abutment work at the new bridge over Upper Dummerston Road has begun and will continue following the winter season.

· The new roadway alignment will continue through the 2016 non-winter season.

Trail Talks

We will continue to hold monthly trail talks for the community. The next Trail Talk will be held on December 12th.

Safety

Please focus on safety when driving through the construction work zone and remember that it is now against the law for drivers to use a hand-held cell phone.

For More Information

If you would like additional information, or would like to add others to this distribution list, please contact Cindy Cook, Public Relations Officer, Adamant Accord, Inc. ccook@adamantaccord.com.

Cindy Cook
Principal, Adamant Accord, Inc.
Past Vice President, Association for Conflict Resolution

Leave a Reply